Gas supply and distribution
1
Gasification of the city of Alatau
Client:
State Institution "Department of Energy and Water Supply of Almaty region"
Stage:
Feasibility Study (FS), Design&Working Documentation
Year:
2025

ГУ Управление энергетики и коммунального

хозяйства Алматинской области

Project Highlights
A gas supply scheme has been developed for the city of Alatau in the Almaty region until 2050, including an analysis of the current state of the system, forecasting future gas needs, and preparing schematic and cartographic materials.
The project documentation has been developed taking into account the approved General Plan of the city and regulatory requirements.

The aim of the project is to create a reliable and long-term gas supply system for Alatau, provide the population with environmentally friendly fuel, reduce dependence on outdated heating sources and create a modern infrastructure for the sustainable development of the region.
2
Gasification of Astana city
Client:
State Institution "Department of Energy of Astana city"
Stage:
FS, Author's supervision
Year:
2018
Project Highlights
Gasification of Astana city

A feasibility study was carried out for the construction of gas distribution networks, including the development of a gas supply scheme and the calculation of capital costs. Working documentation has also been prepared and author's supervision has been carried out for individual residential areas of the capital. These works laid the foundation for the phased gasification of Astana and the improvement of the environmental sustainability of the urban environment.
The aim of the project is to provide Astana and the surrounding residential areas with environmentally friendly and affordable fuel — natural gas, reduce air pollution by eliminating coal-fired heating and create a modern gas distribution infrastructure to improve the quality of life of the population.
3
Main gas pipeline for Almaty and Almaty region
Client:
State Institution "Department of Energy and Housing of the Almaty region"
Stage:
Project, Working Documentation and Author's supervision
Year:
2014
Project Highlights
  • The Almaty – Bayserke–Talgar gas Pipeline project was developed and implemented in order to provide the city of Almaty and the settlements of the Almaty region with additional volumes of natural gas. The new gas pipeline has increased the reliability of the agglomeration's energy supply and has become an important step in the development of the regional gas transportation infrastructure.
  • The importance of the project:
  • improving the reliability and continuity of gas supply;
  • development of gas infrastructure in the agglomeration area;
  • support for the socio-economic growth of the region;
  • creating conditions for environmental modernization and improving the quality of life of the population.
4
Integrated gas treatment facility at the Amangeldy field
Client:
Amangeldy Gas LLP
Stage:
Project adaptation, Author's supervision
Year:
2003
Project Highlights
The Integrated Gas Treatment Plant, Amangeldy field, the project was developed and implemented in cooperation with the American company BSI Industries to ensure stable natural gas supplies to the southern regions of Kazakhstan.
The following tasks were performed within the framework of the project:
adaptation of project documentation to the requirements of the regulatory and technical base of the Republic of Kazakhstan;
author's supervision of the implementation of design decisions during the construction process.
The purpose of the participation is to ensure that design solutions comply with the standards and regulations of the Republic of Kazakhstan and monitor their correct implementation.
The aim of the project is to create a modern integrated gas treatment plant to bring the extracted raw materials to marketable quality and then supply them to the gas transportation system, which makes it possible to cover the growing energy needs of the southern regions of Kazakhstan.
Project

Stage

Year

“External gas supply for the Koksai field” in Kerbulak District, Zhetysu Region.
Client: “Consolidated Construction Mining Company”.

Working Project

2024

Services for updating/revising the General Gasification Scheme of the Republic of Kazakhstan.
Client: Intergas Central Asia.

Updating

2024

Revision of design documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Kokzhazyk, Eskeldinsky District, Almaty Region.”

Client: “Department of Energy and Housing and Utilities of Almaty Region” / Golden City DS LLP.

Working Project

2024

Development of working documentation for construction of gas pipeline networks, Stage 3, Start-up Complex 1.
Client: Housing and Utilities Department of Zhezkazgan.

Working documentation

2024

Development of working documentation for construction of gas pipeline networks, Stage 3, Start-up Complex 2.
Client: Housing and Utilities Department of Zhezkazgan.

Working documentation

2024

Updating of the project “Gas supply for existing and planned boiler houses for heat supply of the Institute of Nuclear Physics buildings at 1 Ibragimov St., Alatau Microdistrict, Almaty.”
Client: Institute of Nuclear Physics, RSE on the Right of Economic Management (Ministry of Energy of the Republic of Kazakhstan).

Updating

2023

Author’s supervision for the project “Construction of gas pipelines for reconnection of industrial enterprises, municipal utility facilities, and multi-storey residential buildings in Shymkent, South Kazakhstan Region. Stage 4.”
Client: Shymkent Production Branch of KazTransGas Aimak JSC.

Author’s supervision

2023

Author’s supervision during construction of a high-pressure gas supply pipeline from the Zhanakorgan AGDS and intra-settlement gas distribution networks of Tomenaryk, Zhanakorgan District, Kyzylorda Region.
Client: Housing and Utilities, Passenger Transport and Roads Department of Zhanakorgan District.

Author’s supervision

2023

Development of design and survey works for the project “Modernization of a gas distribution pipeline section from Seitova St. to Microdistrict 12, with installation of GRPC-15-1N-U1 and loop connection to a low-pressure PE gas pipeline up to Sankibay Batyr Ave., Aktobe.”
Client: Aktobe Production Branch of KazTransGas Aimak JSC.

Development of design and survey works

2023

Design and estimate documentation (two-stage) for “Construction of gas supply pipelines to boiler houses of Zhaiyrem Mining and Processing Plant JSC.”
Client: Zhaiyrem Mining and Processing Plant JSC.

Working Project

2023

Author’s supervision services for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 2, Start-up Complex 2.”
Client: Housing and Utilities, Passenger Transport and Roads Department of Zhezkazgan.

Author’s supervision

2023

Author’s supervision for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 2, Start-up Complex 1.”
Client: Housing and Utilities, Passenger Transport and Roads Department of Zhezkazgan.

Author’s supervision

2023

Author’s supervision for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 2, Start-up Complex 3.”
Client: Housing and Utilities, Passenger Transport and Roads Department of Zhezkazgan.

Author’s supervision

2023

Author’s supervision for the project “Construction of a gas supply pipeline and gas distribution networks in Birlik Village, Zhambyl District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Author’s supervision

2023

Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Masak Village (Kaztai Ultarakov), Enbekshikazakh District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Working Project

2023

Development of design and estimate documentation (DED) for the project “Construction of a gas supply pipeline and gas distribution networks in Nurly Village, Enbekshikazakh District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Working Project

2023

Author’s supervision for the project “Construction of a gas supply pipeline and gas distribution networks in Beriktas Village, Zhambyl District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Author’s supervision

2023

Author’s supervision for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP (Stage II, Start-up Complexes 1 and 2).”
Client: State Institution “Construction Department of Temirtau”.

Author’s supervision

2023

Author’s supervision for the project “Construction of a gas supply pipeline and gas distribution networks in Koktal Village, Talgar District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Author’s supervision

2023

Author’s supervision for the project “Construction of a gas supply pipeline and gas distribution networks in Enbek Village, Ili District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Author’s supervision

2023

Author’s supervision for the project “Construction of a gas supply pipeline and gas distribution networks in Charyn Village, Uygur District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.

Author’s supervision

2023

Development of design and estimate documentation for construction of a gas pipeline and branches, including pipeline crossings over water obstacles, in Kyzylsuat Village, Tselinograd District, Akmola Region.
Client: Construction Department of Tselinograd District.
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Kuigan Village, Ili District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Karasai Village, Enbekshikazakh District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Malyi Dekhan Village, Uygur District, Almaty Region.”
Client: Department of Energy and Housing and Utilities of Almaty Region.
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Ketpen Village, Uygur District, Almaty Region.”
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Bolshoi Dekhan Village, Uygur District, Almaty Region.”
Working Project
2023
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Ekpendi Village, Eskeldinsky District, Almaty Region.”
Working Project
2021
Development of design and estimate documentation (DED) for the facility “Construction of gas supply pipelines to 8 settlements of Tarbagatai District (Tugyl, Zhanatileu, Akzhar, Kabanbay, Ak Mektep, Karasu, Sholakorda, Aksuat).”
Client: State Institution “Department of Housing and Utilities, Passenger Transport, Motor Roads, Construction and Housing Inspection of Tarbagatai District”.
Working Project
2021
Author’s supervision for the facility “Construction of gas distribution networks in Akshi Village, Ili District.”
Client: Er-Nur Stroy i K LLP.
Author’s supervision
2021
Author’s supervision of the works “Construction of a gas supply pipeline and intra-block gas distribution networks of Zhosaly Settlement.”
Client: State Institution “Department of Energy and Housing and Utilities of Kyzylorda Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Akdala Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision services for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 2, Start-up Complex 1.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhezkazgan”.
Author’s supervision
2021
Development of the section “External gas pipeline from the GRP to the tie-in point at the CHP-3 site” as part of working documentation under the project “Construction of CHP-3 in Astana. Stage 1 (Revision).”
Client: KazSRD Institute JSC.
Working documentation
2021
Working documentation for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP, Stage 1, Start-up Complex 2.”
Client: State Institution “Construction Department of Karaganda”.
Working documentation
2021
Working documentation for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP, Stage 1, Start-up Complex 3.”
Client: State Institution “Construction Department of Karaganda”.
Working documentation
2021
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Client: State Institution “Construction Department of Karaganda”.
Author’s supervision
2021
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Miyaly Village, Balkhash District, Almaty Region (Revision).”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2021
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Boyauly Village, Balkhash District, Almaty Region (Revision).”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2021
Author’s supervision for the facility “Construction of intra-settlement gas supply networks in Karabulak, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Development of working documentation for “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 2, Start-up Complex 2.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhezkazgan”.
Working documentation
2021
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Charyn Village, Uygur District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2021
Development of design and estimate documentation for the project “Construction of a high-pressure gas supply pipeline and intra-settlement gas distribution networks of Tomenaryk, Zhanakorgan District, Kyzylorda Region.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhanakorgan District”.
Working Project
2021
Development of design and estimate documentation (Working documentation as Stage 2 of design) for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP, Stage II, Start-up Complex 1.”
Client: Venture Partners LLP.
Working Project
2021
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 22.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision services for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP, Stage 1, Start-up Complex 2.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhezkazgan”.
Author’s supervision
2021
Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 7, 8, 9.”
Client: State Institution “Department of Fuel and Energy Complex and Utilities of Nur-Sultan”.
Author’s supervision
2021
Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 3, 4, 5, 6.”
Client: State Institution “Department of Fuel and Energy Complex and Utilities of Nur-Sultan”."
Author’s supervision
2021
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Arkabay Village, Talgar District, Almaty Region (Revision).”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2021
Development of design and estimate documentation for the project “Construction of gas distribution networks in Taldykorgan (Start-up Complex 22a).”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2021
Development of design and estimate documentation for the project “Gas pipeline from the BGH ‘Nur Zholy’ to the 115 MW boiler house of the IBC ‘Khorgos’.”
Client: Managing Company of the Special Economic Zone “International Border Cooperation Center Khorgos” JSC.
Working Project
2021
Author’s supervision services for the project “Construction of a gas pipeline branch and the Atasu AGDS with gas distribution networks of Atasu Settlement, Zhanaarka District, Karaganda Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Karaganda Region”.
Author’s supervision
2021
Author’s supervision services for the project “Construction of a gas pipeline branch and the Osakarovka AGDS with gas distribution networks of Osakarovka Settlement, Karaganda Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Karaganda Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Client: State Institution “Department of Housing and Utilities, Passenger Transport, Motor Roads, Construction and Housing Inspection of Temirtau”.
Author’s supervision
2021
Author’s supervision for the project “Construction of gas pipelines for reconnection of industrial enterprises, municipal utility facilities and multi-storey residential buildings in Shymkent, South Kazakhstan Region. Stage 2.”
Client: KazTransGas Aimak JSC.
Author’s supervision
2021
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 2).”
Client: State Institution “Construction Department of Karaganda”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 3).”
Client: State Institution “Construction Department of Karaganda”.
Author’s supervision
2021
Author’s supervision for construction of a high-pressure gas pipeline to EuroChem-Karatau LLP chemical complex and the city of Zhanatas.
Client: Public Utility Institution “Department of Energy and Housing and Utilities of the Akimat of Zhambyl Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP (Stage I, Start-up Complex 2).”
Client: State Institution “Department of Housing and Utilities, Passenger Transport, Motor Roads, Construction and Housing Inspection of Temirtau”.
Author’s supervision
2021
Author’s supervision for construction of external gas supply networks, Stage 1, Gate City, Stage 2.
Client: Alatau Development JSC.
Author’s supervision
2021
Author’s supervision for the facility “Construction of gas supply networks, Stage 1, Gate City, Stage 2, Start-up Complex 3 of the Gate City satellite city in Almaty Region.”
Client: Alatau Development JSC.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Boyauly Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Miyaly Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Bakbakty Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Birlik Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Author’s supervision services for the project “Modernization of the gas distribution network of Taraz, Stage 2, Start-up Complex 3.”
Client: KazTransGas Aimak JSC.
Author’s supervision
2021
Author’s supervision services for the facility “Construction of a gas-fired boiler house for heat supply of a group of residential buildings on Bokazhanov St., Zaisan, East Kazakhstan Region.”
Client: State Institution “Department of Architecture, Urban Planning and Construction of Zaisan District”.
Author’s supervision
2021
Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Targap Village, Zhambyl District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2021
Development of the sections “Modernization and reconstruction of the CoGTPP” and “Gas Supply” within the feasibility study “Modernization and expansion of the Kyzylorda combined heat and power plant, Kyzylorda.”
Client: KazNIPI Energoprom Institute JSC.
FS
2020
Development of design and estimate documentation, including independent expert review, for construction of gas pipelines from new gas distribution networks to large-panel residential buildings in Microdistricts No. 11, 12, 13, 15, 16, 17, 18, Verkhniy Otyrar, Nizhniy Otyrar, and Turlanskaya Expedition.
Client: KazTransGas Aimak JSC.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Miyaly Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Boyauly Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentatioт for the project “Construction of a gas supply pipeline and gas distribution networks in Birlik Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Akdala Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Bakbakty Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Samsy Village, Zhambyl District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentatioт for the project “Construction of a gas supply pipeline and gas distribution networks in Ulgili Village, Zhambyl District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Ekpendi Village, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Kokzhazyk, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Matay Baisova, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Targap Village, Zhambyl District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Terekty, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Karatalskoye, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region
Working Project
2020
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 20.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2020
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 21.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Author’s supervision
2020
Author’s supervision for the facility “Construction of an внутрипоселковый medium- and low-pressure gas pipeline in Chunja, Uygur District, Almaty Region.”
Client: AziyaGaz Chunja LLP.
Author’s supervision
2020
Development of design and estimate documentation for the project “Gas pipeline from the BGH ‘Nur Zholy’ to the 115 MW boiler house of the IBC ‘Khorgos’.”
Client: Managing Company of the Special Economic Zone “International Border Cooperation Center Khorgos” JSC.
Working Project
2020
Development of working documentation for the project “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS of the Saryarka main gas pipeline, Stage 1, Start-up Complex 2.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhezkazgan”.
Working documentation
2020
Construction of a high-pressure gas pipeline to the EuroChem-Karatau LLP chemical complex and the city of Zhanatas.
Client: StroyGazCompnay LLP.
Working Project
2020
Working documentation for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP, Stage 2, Start-up Complexes 1 and 2.”
Client: State Institution “Department of Housing and Utilities of Temirtau”.
Working documentation
2020
Author’s supervision for the works “Construction of a gas supply pipeline and intra-block gas distribution networks of Zhaksykylysh Settlement.”
Client: State Institution “Department of Energy and Housing and Utilities of Kyzylorda Region”.
Author’s supervision
2020
Author’s supervision for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka main gas pipeline.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport”.
Author’s supervision
2020
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Client: State Institution “Construction Department of Karaganda”.
Author’s supervision
2020
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Client: State Institution “Construction Department of Karaganda”.
Author’s supervision
2020
Author’s supervision for the facility “Construction of gas pipelines for reconnection of industrial enterprises, municipal utility facilities and multi-storey residential buildings in Shymkent, South Kazakhstan Region. Stage 3.”
Client: KazTransGas Aimak JSC.
Author’s supervision
2020
Author’s supervision for construction of a high-pressure gas pipeline to EuroChem-Karatau LLP chemical complex and the city of Zhanatas.
Client: Public Utility Institution “Department of Energy and Housing and Utilities of the Akimat of Zhambyl Region”.
Author’s supervision
2020
Development of working documentation for the project “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS of the Saryarka main gas pipeline, Stage 2, Start-up Complex 1.”
Client: State Institution “Department of Housing and Utilities, Passenger Transport and Motor Roads of Zhezkazgan”.
Рабочая документация
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Taskarasu Village, Uygur District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Bakhar Village, Uygur District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Charyn Village, Uygur District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Tekeli, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.
Working Project
2020
Working documentation for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP, Stage 1, Start-up Complex 2.”
Client: State Institution “Construction Department of Karaganda”
Рабочая документация
2020
Working documentation for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP, Stage 1, Start-up Complex 3.”
Client: State Institution “Construction Department of Karaganda”.
Working documentation
2020
Проект

Стадия

Год

Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 7, 8, 9.”
Client: State Institution “Department of Fuel and Energy Complex and Utilities of Nur-Sultan”.

Author’s supervision

2020

Author’s supervision for the facility “Gas supply for Kapshagayzhylu SUE, Kapshagay, Almaty Region.”
Client: State Institution “Housing and Utilities Department of Kapshagay”.

Author’s supervision

2020

Development of design and estimate documentation for construction of a gas pipeline and branches, including pipeline crossings over water obstacles, in Karaotkel Village, Tselinograd District, Akmola Region.

Client: State Institution “Construction Department of Tselinograd District”.

Working Project

2020

Development of design and estimate documentation for construction of a gas pipeline and branches, including pipeline crossings over water obstacles, in Kyzylsuat Village, Tselinograd District, Akmola Region.
Client: State Institution “Construction Department of Tselinograd District”.

Working Project

2020

Revision of the master plan for distribution networks of Almaty.

Urban planning project

2020

Author’s supervision for the works “Construction of a gas supply pipeline and intra-block networks of Terenozek Settlement.”
Client: State Institution “Department of Energy and Housing and Utilities of Kyzylorda Region”.

Author’s supervision

2020

Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Akdala Village, Balkhash District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.

Author’s supervision

2020

Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 22.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.

Author’s supervision

2020

Author’s supervision for the facility “Construction of intra-settlement gas supply networks in Karabulak, Eskeldinsky District, Almaty Region.”
Client: State Institution “Department of Energy and Housing and Utilities of Almaty Region”.

Author’s supervision

2020

Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 3, 4, 5, 6.”
Client: State Institution “Department of Fuel and Energy Complex and Utilities of Nur-Sultan”.

Author’s supervision

2020

Development of design and estimate documentation for the facility “Construction of gas supply pipelines to 8 settlements of Tarbagatai District (Tugyl, Zhanatileu, Akzhar, Kabanbay, Ak Mektep, Karasu, Sholakorda, Aksuat).”
Client: State Institution “Department of Housing and Utilities, Passenger Transport, Motor Roads, Construction and Housing Inspection of Tarbagatai District”.

Working Project

2020

Author’s supervision of the works “Construction of a gas supply pipeline and intra-block gas distribution networks of Zhosaly Settlement.”
Client: State Institution “Department of Energy and Housing and Utilities of Kyzylorda Region”.

Author’s supervision

2020

Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 1 and 2.”
Client: State Institution “Department of Fuel and Energy Complex and Utilities of Nur-Sultan”.

Author’s supervision

2020

Author’s supervision during construction of gas distribution networks in Bozaryk Microdistricts 1, 2, 3, Shymkent.

Author’s supervision

2019

Author’s supervision for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”

Author’s supervision

2019

Development of design and estimate documentation for the project “Construction of a boiler house with a gas pipeline for residential buildings at 84, 88, 88/1 Bokazhanov St.”

Working Project

2019

Development of working design for “Construction of distribution gas pipelines for Start-up Complexes 3–9 under Stage 1 of gasification of Astana.”

Working Project

2019

Development of design and estimate documentation, two-stage, for “Construction of gas distribution networks in Karaganda, Temirtau, and Zhezkazgan.”

Working Project

2019

Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 19.”

Author’s supervision

2019

Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks for the 3rd department of Yerkin Rural District, Taldykorgan.”

Author’s supervision

2019

Author’s supervision for the facility “Construction of a gas supply pipeline and gas distribution networks in Yntymaq Microdistrict, Otenay Rural District, Taldykorgan.”

Author’s supervision

2019

Author’s supervision during construction of gas distribution networks on the left bank of the Syr Darya River in Kyzylorda (Stage 1: high-pressure supply gas pipeline 1.2 MPa from AGDS-1 with installation of GRP-2).
Author’s supervision
2019
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 18.”
Author’s supervision
2019
Author’s supervision during construction of facilities under the project “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 2 (4 facilities).
Author’s supervision
2019
Author’s supervision during construction of facilities under the project “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 2 (3 facilities).
Author’s supervision
2019
Author’s supervision during construction of facilities under the project “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 2 (2 facilities).
Author’s supervision
2019
Author’s supervision during construction of facilities under the project “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 2 (1 facility).
Author’s supervision
2019
Technical consulting services; development of the section “Gasification”.
Consulting
2019
Author’s supervision for the facility “Construction of a boiler house with a gas pipeline for the Central District Hospital building and residential houses on Spambetov St., Zaisan, East Kazakhstan Region.”
Author’s supervision
2019
Working documentation stage: “Construction of gas distribution networks of Zhezkazgan from the Saryarka main gas pipeline, Stage 1 of construction, Start-up Complex 2.”
Working documentation
2019
Development of design and estimate documentation for the project “Gas pipeline from the BGH ‘Nur Zholy’ to the 115 MW boiler house of the IBC ‘Khorgos’.”
Working Project
2019
Author’s supervision during construction of gas distribution networks on the left bank of the Syr Darya River in Kyzylorda (Stage 1: high-pressure supply gas pipeline 1.2 MPa from AGDS-1 with installation of GRP-2).
Author’s supervision
2019
Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 7, 8, 9.”
Author’s supervision
2019
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan, Stage IV, Start-up Complex 20.”
Author’s supervision
2019
Author’s supervision for the facility “Construction of gas distribution networks of Temirtau from the Temirtau AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Author’s supervision
2019
Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 3, 4, 5, 6.”
Author’s supervision
2019
Author’s supervision services during construction of the facility “Gasification of Astana. Stage I, Start-up Complexes 1 and 2.”
Author’s supervision
2019
Author’s supervision for the works “Construction of gas distribution networks of Zhezkazgan from the Zhezkazgan AGDS, Saryarka MGP.”
Author’s supervision
2019
Author’s supervision for the facility “Construction of intra-settlement gas supply networks in Karabulak, Eskeldinsky District, Almaty Region.”
Author’s supervision
2019
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Miyaly Village, Balkhash District, Almaty Region.”
Working Project
2019
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Boyauly Village, Balkhash District, Almaty Region.”
Working Project
2019
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Birlik Village, Balkhash District, Almaty Region.”
Working Project
2019
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Akdala Village, Balkhash District, Almaty Region.”
Working Project
2019
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Bakbakty Village, Balkhash District, Almaty Region.”
Working Project
2019
Development of the sections “Modernization and reconstruction of the Combined Cycle Gas Turbine Power Plant” and “Gas Supply” within the feasibility study “Modernization and expansion of the Kyzylorda CHPP, Kyzylorda.”
FS
2019
Development of design and estimate documentatioт for the facility “Construction of gas supply pipelines to 8 settlements of Tarbagatai District (Tugyl, Zhanatileu, Akzhar, Kabanbay, Ak Mektep, Karasu, Sholakorda, Aksuat).”
Working Project
2019
Author’s supervision for the facility “Construction of gas distribution networks of Karaganda from the Karaganda AGDS, Saryarka MGP (Stage I, Start-up Complex 1).”
Author’s supervision
2019
Author’s supervision for construction of a high-pressure gas pipeline to the EuroChem-Karatau LLP chemical complex and the city of Zhanatas.
Author’s supervision
2019
Development of design and estimate documentation, including independent expert review, for construction of gas pipelines from new gas distribution networks to large-panel residential buildings in Microdistricts No. 11, 12, 13, 15, 16, 17, 18, Verkhniy Otyrar, Nizhniy Otyrar, and Turlanskaya Expedition.
Working Project
2019
Working documentation stage: “Construction of gas distribution networks of Zhezkazgan from the Saryarka main gas pipeline, Stage 1 of construction, Start-up Complex 2.”
Working documentation
2019
Author’s supervision for the facility “Construction of gas distribution networks in Akshi Village, Ili District.”
Author’s supervision
2019
Author’s supervision for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply), Kazalinsk, Kazalinsky District, Kyzylorda Region.”
Author’s supervision
2019
Author’s supervision for the facility “Construction of intra-settlement medium- and low-pressure gas pipeline in Chunja, Uygur District, Almaty Region.”
Author’s supervision
2019
Author’s supervision during construction of the facility “Construction of a gas supply pipeline and intra-block networks of Terenozek Settlement.”
Author’s supervision
2019
Author’s supervision during construction of the facility “Construction of a gas supply pipeline and intra-block gas distribution networks of Zhosaly Settlement.”
Author’s supervision
2019
Author’s supervision during construction of the facility “Construction of a gas supply pipeline and intra-block gas distribution networks of Zhaksykylysh Settlement.”
Author’s supervision
2019
Development of working documentation for the project “Construction of gas distribution networks in Taldykorgan,” Stage IV, including Start-up Complexes 21 and 22, and Start-up Complex 20, in accordance with the terms of reference.
Working documentation
2018
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks for the 3rd department of Yerkin Rural District, Taldykorgan.”
Working Project
2018
Development of design and estimate documentation for the project “Construction of a gas supply pipeline and gas distribution networks in Yntymaq Microdistrict, Otenay Rural District, Taldykorgan.”
Working Project
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage II, Start-up Complex 7.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage II, Start-up Complex 9.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage II, Start-up Complex 10.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage II, Start-up Complex 11.
Author’s supervision
2018
Design of “Gasification of the Institute of Nuclear Physics facility in accordance with the technical specification.”
Working Project
2018
Development of design and estimate documentation for an intra-settlement medium- and low-pressure gas pipeline in Chunja Village, Uygur District, Almaty Region.
Working Project
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage II, Start-up Complex 8.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 16.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 17.
Author’s supervision
2018
Author’s supervision for the facility “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 1, Facility 2.
Author’s supervision
2018
Author’s supervision for the facility “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 1, Facility 3.
Author’s supervision
2018
Author’s supervision for the facility “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 1, Facility 4.
Author’s supervision
2018
Revision works for the feasibility study under the project “Gasification of Astana.”
FS
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 12.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 13.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 14.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage III, Start-up Complex 15.
Author’s supervision
2018
Development of design and estimate documentation for gas supply of Kapshagayzhylu municipal utility enterprise, Kapshagay, Almaty Region.
Working Project
2018
Author’s supervision for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply) in Ayteke Bi Settlement, Kazalinsky District, Kyzylorda Region.”
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas pipelines for reconnection of industrial enterprises, municipal utility facilities and multi-storey residential buildings in Shymkent, South Kazakhstan Region. Stage 1.”
Author’s supervision
2018
Comprehensive works: development of design and estimate documentation and execution of construction and installation works for reconnection of industrial enterprises, municipal utility facilities and multi-storey residential buildings, Stage 1, Shymkent, South Kazakhstan Region.
Working Project
2018
Development of design and estimate documentation for the project “Construction of a boiler house with a gas pipeline for residential buildings at 84, 88, 88/1 Bokazhanov St.”
Working Project
2018
Development of working design for “Construction of distribution gas pipelines for Start-up Complexes 3–9 under Stage 1 of gasification of Astana.”
Working Project
2018
Development of design and estimate documentation, two-stage, for “Construction of gas distribution networks in Karaganda, Temirtau, and Zhezkazgan.”
Working Project
2018
Author’s supervision for the facility “Construction of intra-settlement gas supply networks in Karabulak Settlement, Eskeldinsky District, Almaty Region.”
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Akshi Village, Ili District.”
Author’s supervision
2018
Author’s supervision during construction of gas distribution networks on the left bank of the Syr Darya River in Kyzylorda (Stage 1: high-pressure supply gas pipeline 1.2 MPa from AGDS-1 with installation of GRP-2).
Author’s supervision
2018
Author’s supervision for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply) in Kazalinsk, Kazalinsky District, Kyzylorda Region.”
Author’s supervision
2018
Author’s supervision for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply) in Kazalinsk, Kazalinsky District, Kyzylorda Region.”
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage IV, Start-up Complex 18.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage IV, Start-up Complex 20.
Author’s supervision
2018
Author’s supervision for the facility “Construction of gas distribution networks in Taldykorgan,” Stage IV, Start-up Complex 19.
Author’s supervision
2018
Author’s supervision for the facility “Construction of an intra-settlement medium- and low-pressure gas pipeline in Chunja Village, Uygur District, Almaty Region.”
Author’s supervision
2018
Author’s supervision for the facility “Construction of an intra-settlement medium- and low-pressure gas pipeline in Chunja Village, Uygur District, Almaty Region.”
Author’s supervision
2018
Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 1.
Author’s supervision
2017
Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 3.
Author’s supervision
2017
Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 2.
Author’s supervision
2017
Development of design and estimate documentation under the working design for “Construction of gas distribution networks in Taldykorgan,” Stage 2, Start-up Complexes 9, 10, 11.
Working Project
2017
Development of working design for gas supply of Zhosaly Settlement.
Working Project
2017
Author’s supervision during construction of gas distribution networks in Bozaryk Microdistricts 1, 2, 3, Shymkent.
Author’s supervision
2017
Author’s supervision during construction of gas supply networks in Yntymaq-2 Microdistrict, Shymkent.
Author’s supervision
2017
Development of design and estimate documentation for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply) in Kazalinsk, Kazalinsky District, Kyzylorda Region.”
Working Project
2017
Development of design and estimate documentation for the facility “Infrastructure provision for residential buildings to be constructed on a 180-hectare land plot (gas supply) in Ayteke Settlement, Kazalinsky District, Kyzylorda Region.”
Working Project
2017
Development of design and estimate documentation for “Construction of a boiler house with a gas pipeline for the Central District Hospital building and residential houses at 1 Spambetov St.”
Working Project
2017
Проект

Стадия

Год

Development of design and estimate documentation for Stage 2, Start-up Complex 2 under the project “Modernization of the gas distribution network of Taraz.”

Working Project

2017

Revision of design and estimate documentation for the facility “External gas supply networks of Pokrovka Settlement” within the project “Construction of GRS for 7 settlements of Ili District, Almaty Region (Stage 2).”

Working Project

2017

Author’s supervision for the facility “Construction of the high-pressure distribution gas pipeline ‘Taldykorgan–Tekeli’.”

Author’s supervision

2017

Development of design and estimate documentation under the working design (WD) for “Construction of gas distribution networks in Taldykorgan,” Stage 3, Start-up Complexes 12, 13, 14, 15, 16, 17.

Working Project

2017

Author’s supervision for construction of the Shanak AGDS and the supply gas pipeline to Akzhar Settlement, Shanak Rural District, Kazygurt District, South Kazakhstan Region.

Author’s supervision

2017

Author’s supervision for “Modernization of gas distribution networks in the villages of Sai-Utes, Sheber, Akshimirau, Kyzan, Tushchykuduk, Mangystau District, Mangystau Region.”

Авторский надзор

2017

Author’s supervision for the facility “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 1, Facility 1.

Author’s supervision

2017

Author’s supervision for the facility “Modernization of the gas distribution network of Taraz,” Stage 2, Start-up Complex 1, Facility 5.

Author’s supervision

2017

Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 4.

Author’s supervision

2017

Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 5.

Author’s supervision

2017

Author’s supervision services for the facility “Construction of gas distribution networks in Taldykorgan,” Stage 1, Start-up Complex 6.

Author’s supervision

2017

Author’s supervision during construction of the gas pipeline branch from AGDS-2 to the glass plant in Kyzylorda.

Author’s supervision

2016

Development of working documentation for construction of gas distribution networks in Taldykorgan, Stage 1.

Рабочая документация

2016

Revision of the project “Modernization of the GDS of Shymkent and South Kazakhstan Region.”

Working Project

2016

Comprehensive works: design and construction of gas networks within the GRP-55 area (Karabastau Settlement) under the project “Modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”

Working Project

2016

Comprehensive works: design and construction of gas networks within the GRP-113 area (Badamsha Settlement) under the project “Modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”

Working Project

2016

Comprehensive works: design and construction of gas networks within the GRP-117 area (Kyzylzhar Microdistrict) under the project “Modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”

Working Project

2016

Comprehensive works: design and construction of gas networks for individual houses at the completion stage of the project “Modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”

Working Project

2016

Comprehensive works: design and construction of gas networks within the GRP-115 area (Kommunizm Microdistrict) under the project “Modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”

Working Project

2016

Development of design and estimate documentation for construction of intra-block gas pipeline networks in Terenozek Settlement.

Working Project

2016

Development of working design for gas supply of Zhosaly Settlement.

Working Project

2016

Author’s supervision for “Modernization of gas distribution networks of Taraz,” Stage 1, Start-up Complex 5, Facility 3.
Author’s supervision
2016
Author’s supervision for “Modernization of gas distribution networks of Taraz,” Stage 1, Start-up Complex 5, Facility 4.
Author’s supervision
2016
Author’s supervision for “Modernization of gas distribution networks of Taraz,” Stage 1, Start-up Complex 5, Facility 1.
Author’s supervision
2016
Author’s supervision during construction under the project “Comprehensive works: design and construction of gas networks within the GRP-55 area (Karabastau Settlement) under the project modernization of gas distribution systems of Shymkent and South Kazakhstan Region.”
Author’s supervision
2016
Author’s supervision for “Modernization of gas distribution networks of Taraz,” Stage 1, Start-up Complex 5, Facility 2.
Author’s supervision
2016
Revision of the General Plan of Almaty. Section: Gas Supply.
Urban planning project
2016
Development of design and estimate documentation for Stage 2, Start-up Complex 1 under the project “Modernization of the gas distribution network of Taraz.”
Working Project
2016
Privacy Policy
KATEK LLP Design and Engineering Company
© 2025 All rights reserved.
katek@katek.kz
tel: +7 (727) 241 13 77
tel: +7 (727) 241 13 88
050010, Republic of Kazakhstan
Almaty, Snaipersky Lane, 4