Liquefied gas storage terminals and tanks
1
Construction of a railway filling terminal for the shipment of liquefied propane in Atyrau region
Preliminary Technical and economic calculation
Stage:
Client:
KMG PetroChem LLP
Location:
Near SEZ "NINT" Karabatan
Year:
2025
Project Highlights
Location: SEZ "NINT", Kabatan
Terminal capacity: 440 thousand tons per year
Building area: 34 ha
Within the framework of the KMG PC project, together with KPI, a study was conducted on the possibility of exporting liquefied propane produced at the gas processing complex (GSK). Transportation of products is provided in tank wagons by rail.
In the course of the work, an assessment
was made of the estimated capital costs for the design, construction and purchase of equipment for the LPG terminal;
tariffs that ensure a return on investment;
the payback period of the project, taking into account market conditions.
The terminal's implementation will create a modern infrastructure for the export of LPG, strengthening Kazakhstan's position in the international market and ensuring the growth of the region's investment attractiveness.
Project

Stage

Year

Provision of engineering services for development of the project “Construction of a natural gas liquefaction plant with a maximum feed gas consumption of 1,000 thousand Nm³/day in Panfilov District, Zhetysu Region.”
Client: “SILK WAY ENERGY LTD” Private Company.

Project

2024

Two-stage feasibility study development works for the project “Construction of the first integrated gas chemical complex in Atyrau Region. Phase 2 (of the project ‘Construction of a railway loading terminal for shipment of liquefied propane in Atyrau Region’).”
Client: KMG PetroChem LLP.

FS

2024

Development of design and estimate documentation for Beibars Gaz Group of Companies for the project “Construction of an LPG storage and filling station (LPG SFS) with a capacity of 600 m³ and auxiliary facilities in Kostanay Region, Rudny, oil depot area, industrial zone.”

Client: Kostanay LPG LLP.

Working Project

2021

Provision of author’s supervision during construction of a propane refrigeration unit at the Amangeldy field.
Client: Amangeldy Gaz LLP.

Author’s supervision

2021

Development of design and estimate documentation for Beibars-Gaz Group of Companies for the project “Construction of an LPG storage and filling station (LPG SFS) with a capacity of 1,000 m³ and auxiliary facilities in Aktobe, Siding No. 41.”
Client: Aktobe LPG LLP.

Working Project

2019

Development of design and estimate documentation for Beibars Gaz Group of Companies for the project “Construction of an LPG storage and filling station (LPG SFS) with a capacity of 600 m³ and auxiliary facilities in Kostanay Region, Rudny, oil depot area, industrial zone.”
Client: Kostanay LPG LLP.

Working Project

2019

Provision of engineering services for development of the project “Construction of an LNG plant with a capacity of 500 thousand Nm³/day.”
Client: Gas Chemical Product LLP.

Project

2019

Development of design and estimate documentation for the working design “Modernization of the existing liquefied gas storage base of ALAU LLP to 2,000 m³, with the possibility of separate storage of propane and butane.”
Client: ALAU LLP.

Working Project

2018

Development of design and estimate documentation for the project “Construction of an LPG storage and filling station with a capacity of 1,000 m³ and auxiliary facilities in Aktobe, Siding No. 41.”
Client: Aktobe LPG LLP.

Working Project

2018

Development of design and estimate documentation for Beibars-Gaz Group of Companies for the project “Construction of an LPG storage and filling station with a capacity of 1,000 m³ and auxiliary facilities in Aktobe, Siding No. 41.”
Client: Aktobe LPG LLP.

Working Project

2018

Development of design and estimate documentation for Beibars Gaz Group of Companies for the project “Construction of an LPG storage and filling station with a capacity of 600 m³ and auxiliary facilities in Kostanay Region, Rudny, oil depot area, industrial zone.”
Client: Kostanay LPG LLP.

Working Project

2018

Development of design and estimate documentation for the working design “Modernization of the existing liquefied gas storage base of ALAU LLP to 2,000 m³, with the possibility of separate storage of propane and butane.”
Client: ALAU LLP.

Working Project

2017

Design and survey works for the project “Construction of a CNG filling station in Kyzylorda.”
Client: KTG Ónimderi LLP.

Development of design and survey works

2016

Privacy Policy
KATEK LLP Design and Engineering Company
© 2025 All rights reserved.
katek@katek.kz
tel: +7 (727) 241 13 77
tel: +7 (727) 241 13 88
050010, Republic of Kazakhstan
Almaty, Snaipersky Lane, 4